Prev: Re: [GZG] GEVs Next: Re: [GZG] Subject: Re: What are the pitfalls of standardised forces?

Re: [GZG] Subject: Re: What are the pitfalls of standardised forces?

From: Ground Zero Games <jon@g...>
Date: Mon, 14 Jul 2008 22:49:15 +0100
Subject: Re: [GZG] Subject: Re: What are the pitfalls of standardised forces?

>Your PSB could allow for some sort of contra-magnetic bearing system 
>where the large bearing is a magnetic field instead of a mechanical 
>bearing. I get your point though, and there is always going to be 
>something to replace. If not a bearing, then a magnetic coupler for 
>the mag bearings.
>
>There is always going to be some component to break.

...and it'll always be the one component your engineering stores has 
just used the last one of....  ;-)

Jon (GZG)

>
>-Eli
>
>
>-------------- Original message --------------
>From: Ryan Gill <rmgill@mindspring.com>
>
>>  At 5:03 PM +0100 7/14/08, Adrian1 wrote:
>>  >I know little if anything about mechanics but aren't
hovercraft/GEVs
>>  >less complicated than wheeled tracked vehicles. WIth no need to
>>  >replace wheels/tracks or broken suspension, etc.
>>
>>  Bearings are bearings. It's FAR easier to swap out a road wheel 
>>and bearing than
>>  say a high speed bearing. Presumably GRAV uses some high energy 
>>components that
>>  don't wear, but they'll still have an MBTF of some non infinite 
>>number. Ever see
>>  a high voltage transformer that failed NOT do so spectacularly? 8-o
>>
>>  --
>>  --
>>  ----------------------------------------------------------------
>>  - Data Center Operations Group -
>>  - http://web.turner.com /data_center/ -
>>  ----------------------------------------------------------------
>>  - Ryan Montieth Gill One CNN Center SE0813 E -
>>  - Internet Technologies -- Data Center Operations -
>>  - Hours 9:30am - 5:30pm Mon - Fri (8Sdc, 10Sdc IT@3Ndc) -
>>  - Cellular: 404-545-6205 ( Suwanee and Manassas DCs) -
>>  - Office: 404-588-6191 e-mail: Ryan.Gill@cnn.com -
>>  ----------------------------------------------------------------
>>  - Emergency Power-off != Door release! -
>>  ----------------------------------------------------------------
>>
>>  _______________________________________________
>>  Gzg-l mailing list
>>  Gzg-l@vermouth.csua.berkeley.edu
>> 
http://vermouth.csua.berkeley.edu:1337/cgi-bin/mailman/listinfo/gzg-l
>
>
>_______________________________________________
>Gzg-l mailing list
>Gzg-l@vermouth.csua.berkeley.edu
>http://vermouth.csua.berkeley.edu:1337/cgi-bin/mailman/listinfo/gzg-l

_______________________________________________
Gzg-l mailing list
Gzg-l@vermouth.csua.berkeley.edu
http://vermouth.csua.berkeley.edu:1337/cgi-bin/mailman/listinfo/gzg-l


Prev: Re: [GZG] GEVs Next: Re: [GZG] Subject: Re: What are the pitfalls of standardised forces?