GZG List archives -- September 2005
Re: [GZG] Miniatures Transport
I do it the second way. I actually use large square on the basee
and smaller "channel" on the ship. After cutting the channel I bevel
the edges with the dremel. Adds 3 or 4 seconds.
An additional advantage is I have "painting" bases. They have been
primered about 15 times now. :)
Roger
On 9/16/05, Gregory Wong <sax@xxxxxxxxxxxxxxxxxx> wrote:
Is there a reason for mounting the larger tube on the base and on
the ship and putting the smaller tube inside the bigger one?
Would it also work to either:
1. Use the smaller tube as the base and mount the larger tube on
the ship and just slip the larger tube + ship onto the smaller tube?
2. Use the larger tube at the base and mount the smaller tube on
the ship and insert the smaller tube + ship into the larger tube?
Anyone try that?
--Greg
_______________________________________________
Gzg-l mailing list
Gzg-l@xxxxxxxxxxxxxxxxxxxxxxx
http://lists.csua.berkeley.edu/mailman/listinfo/gzg-l
_______________________________________________
Gzg-l mailing list
Gzg-l@xxxxxxxxxxxxxxxxxxxxxxx
http://lists.csua.berkeley.edu/mailman/listinfo/gzg-l
Main Index | Thread Index | Author Index | Archive Index
roger@nospam.firedrake.org
Generated: Sat Oct 01 01:07:37 GMT 2005