GZG List Archives -- May 2000
Math
I feel silly.
Work equals force times distance.
Given Roger's 100km and 10 tons we'll try a constant force slightly more
than gravity (F=ma or Fg=10 tons * 9.81m/s2) We'll approximate g at 10 and
constant, which is not correct, but gets us in the right ballbark. Thus:
W = 100 000 m * 10 000 kg * 10 m/s²
W = 1E5 m * 10E4 kg * 10 m/s²
W = 10E10 kgm²/s²
That's 10E10 joules, or 10E4 MJ (which already is a unit of energy)
Divided by 3600 seconds, that yields
2.8MW-hours... or 28MW-hours at the 10% effiecieny you mentioned.
Interestingly, my wife is just designing a 20MW power plant for an
industrial installation.
--
maxxon@swob.dna.fi (Mikko Kurki-Suonio) | A pig who doesn't fly
GSM +358 50 5596411 Tel +358 9 8092681 | is just an ordinary pig
Länsimetsä 3B1 02300 ESPOO FINLAND Hate me? Try | - Porco Rosso
http://www.swob.dna.fi/~maxxon/ hateme.html |
Main Index | Thread Index | Author Index | Archive Index
roger@nospam.firedrake.org
Generated: Thu Sep 12 15:05:57 GMT 2002